Wednesday, 16 November 2016

First day of filming

The first day of filming went very well we booked the equipment needed which was the projector and DSLR camera. we then put the footage on to a drive, and imported them to Premiere Pro which is the software i will use for editing.

Budget

Budget


Unit 29 & Unit 4: Music Video Production - Budget

BUDGET: Headspace

 

 

Canon DSLR- £579.00

Soft Box- £52.99

Tripod – manfrotto - £70

Epson EB-X31 Portable Projector-£279.99

 

 

Location Hire –free to use for an hour for whole day

Roof top Stratford- Location permission- £100

Travel (Crew) - £90 for 3people 3days traveling (Adults)

 

Travel Artist –traveling by train cost will be 1 pound per journey, making 4 trips.



INCOME

Artist- £150 for video

Youtube Broadcast deal - £300 + Royalties.

 

£450 + Royalties

  • Media promo for artist eg, events pay to use video

Friday, 11 November 2016

Final meeting before filming- Maarya

In the last meeting i met up with the artist and confirmed the dates and times for filming, theses are Tuesday 15th November at 12:50pm Thursday 17th November at 7:30am. I then received the full lyrics from his track with the full track itself, this has enabled me to come up with a clear idea of the exact shots and locations that will suit the track.

We then started to discuss other alternative locations in addition to one of our original locations, this was the location where some shots would of been filmed in the car. We considered a different location which is in Stratford Jubilee park. Also we locations like a bus and and other buildings were considered.



Wednesday, 9 November 2016

Speaking with the artist

I spoke with the artist  on the phone. we set up a meeting for tomorrow where i will receive the full lyrics from his track and also we will be confirming the exact dates for filming, we will need to be considering the time and weather. Alongside with this we will be visiting the locations and taking pictures of them as part of my pre production recce.

storyboard


Tuesday, 8 November 2016

Pre-Production roles and Meetings

I have equally shared out pre-production roles with my partner, this has enabled us to get on with tasks individually. My role is to carry out the Lyric Analysis, The production schedule, Shot List, Risk Assessment and Location/Recce.
I have met up with the artist and have discussed the dates, times, locations and shots however we need to have another meeting to confirm all of this.

Wednesday, 2 November 2016

Shot list- By Maarya Abbasi

The shots cut back to the same locations however in different angles and shot types.